Warning: session_start(): open(/opt/alt/php72/var/lib/php/session/sess_8aa20046bb995bd216a2a607b57ce53f, O_RDWR) failed: Disk quota exceeded (122) in /home/shweuqjw/awajludhianaki.org/wp-content/plugins/jnews-social-login/class.jnews-social-login.php on line 83

Warning: session_start(): Failed to read session data: files (path: /opt/alt/php72/var/lib/php/session) in /home/shweuqjw/awajludhianaki.org/wp-content/plugins/jnews-social-login/class.jnews-social-login.php on line 83
Renewable energy: Meeting RE target an uphill task - Awaj Ludhiana Ki
Saturday, June 7, 2025
  • Home
  • National
  • International
  • Movies
  • Technology
  • Business
  • Fitness
  • Lifestyle
  • Punjab
  • Contact us
No Result
View All Result
No Result
View All Result
Home Business

Renewable energy: Meeting RE target an uphill task

by author
April 4, 2021
in Business
0
Renewable energy: Meeting RE target an uphill task
0
SHARES
29
VIEWS
Share on FacebookShare on Twitter


The lack of required momentum in the RE sector is also evident from the progress made on the green energy corridors, which were launched in 2015-16 for evacuation of renewable energy from remote locations.

As the deadline of December 2022 for achieving 175 GW of renewable energy (RE) capacity draws closer, it is becoming clear that nothing short of an exponential jump in capacity addition would allow India to reach the target. With an installed RE capacity of 93 GW as of March 2021, there remains a deficit of 83 GW to be bridged, that too in merely 21 months. This has made the parliamentary Standing Committee on Energy ask the Centre to formulate strategies that speed up capacity installation.

Related posts

EXCLUSIVE – Crypto giant Binance controlled ‘independent’ US affiliate’s bank accounts

EXCLUSIVE – Crypto giant Binance controlled ‘independent’ US affiliate’s bank accounts

June 5, 2023
Why investing just to save tax may be bad for you

Why investing just to save tax may be bad for you

June 5, 2023

Several factors have contributed to capacity addition lacking the required momentum, though in the last one year it is Covid-19 that has impacted project auctions, awards, and commissioning, affecting projects that were already facing economic pressures. As an emergency measure against the pandemic, a blanket extension of six months was granted to all projects that needed imports or were to be commissioned. Anuja Tiwari, Partner, Infrastructure and Energy at AZB & Partners, says, “for a host of reasons it appears we will be on the lower side of 75% of the 175-GW target”.

Kameswara Rao, Lead, Energy practice at PwC, differs, saying “we should finish fairly close to the target, possibly falling short by about 15%. This itself is an achievement given delays in project implementation due to the pandemic. It is time to move away from targets and tariffs. Instead, the focus must be on measures needed for renewable energy to meet consumer demand.”

Since the launch of the National Solar Mission plan in 2010, 39 GW of solar energy capacity has been installed, as against the target of 100 GW. Another 36 GW of solar energy projects are under implementation, the Standing Committee on Energy report said. The wind segment saw an addition of 37.7 GW in the last decade, as against the targeted capacity of 60 GW.

But it is rooftop solar that has seen the slowest growth, with capacity addition standing at a meagre 4.4 GW as of March 2021. Merely 430 MW of rooftop installations materialised in 2020, as against the year’s target of 3,000 MW. Lack of awareness has been cited as the main reason for the slow growth of the rooftop sub-sector. The parliamentary committee has recommended that the Union government should widely advertise the benefits of rooftop solar and the incentives it is offering for the same. While there should be a single-window system at the district-level to facilitate rooftop installations, a higher subsidy for customers in the lower income group would go a long way in increasing its adoption, it has said.

The lack of required momentum in the RE sector is also evident from the progress made on the green energy corridors, which were launched in 2015-16 for evacuation of renewable energy from remote locations. The evacuation infrastructure has seen an addition of 7,365 circuit kilometres (ckms), as against the target of 9,700 ckms, while substation capacity of 9,700 million volt ampere (MVA) is way below the targeted 22,600 MVA.

Shubhranshu Patnaik, Partner at Deloitte, says the pace of growth is partly attributable to Covid. Also, since the solar park scheme got exhausted, auctions have seen bidders taking a view on the available transmission interconnection and corridors. “Delay in meeting the target is not an overwhelming concern for now as demand too was affected by Covid and will likely lag 2022 projections. With renewables being the primary means of generation capacity addition in the country, growth in this segment is inevitable. The long term target is already being pegged at 450 GW by 2030, which seems achievable,” he says.

Get live Stock Prices from BSE, NSE, US Market and latest NAV, portfolio of Mutual Funds, Check out latest IPO News, Best Performing IPOs, calculate your tax by Income Tax Calculator, know market’s Top Gainers, Top Losers & Best Equity Funds. Like us on Facebook and follow us on Twitter.

Financial Express is now on Telegram. Click here to join our channel and stay updated with the latest Biz news and updates.





Source link

Previous Post

'Crafts sector's future promising but conducive ecosystem a must for ways to engage entrepreneurial minds'

Next Post

Defying the Covid-19 pandemic: Buoyant exports of ‘core’ products signal trade edge

Related Posts

EXCLUSIVE – Crypto giant Binance controlled ‘independent’ US affiliate’s bank accounts
Business

EXCLUSIVE – Crypto giant Binance controlled ‘independent’ US affiliate’s bank accounts

June 5, 2023
Why investing just to save tax may be bad for you
Business

Why investing just to save tax may be bad for you

June 5, 2023
Share Market outlook today: Nifty, Bank Nifty may to gain on positive global cues; check support, resistance
Business

Share Market outlook today: Nifty, Bank Nifty may to gain on positive global cues; check support, resistance

June 5, 2023
Startup group of G20 calls for $1-trillion commitment
Business

Startup group of G20 calls for $1-trillion commitment

June 5, 2023
DHARAKSHA: Converting rice straw stubble to sustainable packaging material
Business

DHARAKSHA: Converting rice straw stubble to sustainable packaging material

June 4, 2023
Amrita Hospital, Kochi opens two new research centres; announces Rs 65 Crore for charitable care
Business

Amrita Hospital, Kochi opens two new research centres; announces Rs 65 Crore for charitable care

June 4, 2023
Next Post
Defying the Covid-19 pandemic: Buoyant exports of ‘core’ products signal trade edge

Defying the Covid-19 pandemic: Buoyant exports of ‘core’ products signal trade edge

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED NEWS

Power crisis: Centre says all is well as states, discoms flag coal shortage concerns | India News

Power crisis: Centre says all is well as states, discoms flag coal shortage concerns | India News

4 years ago
Dont blame technology, make regulations stronger, Auto News, ET Auto

Dont blame technology, make regulations stronger, Auto News, ET Auto

3 years ago
Business can only get better now: India Inc; inflation, input shortage main worries

Business can only get better now: India Inc; inflation, input shortage main worries

3 years ago
PM Narendra Modi to visit poll-bound Assam, West Bengal on February 7 | India News

PM Narendra Modi to visit poll-bound Assam, West Bengal on February 7 | India News

4 years ago

BROWSE BY CATEGORIES

  • Animals
  • Architecture
  • Automobiles
  • Business
  • Culture
  • Fitness
  • International
  • Lifestyle
  • Movies
  • National
  • Sports
  • Technology
  • Travel

BROWSE BY TOPICS

Architecture culture Fitness indian architecture indian culture indian culture and heritage indian news lifestyle national news Technology technology news Travel travelling

About Us

Awaj Ludhiana Ki

Address

2667/3, Kishore Nagar, Tajpur & Jail Road, Ludhiana – 141008

Recent News

  • Rahul Gandhi Claims Maharashtra-Like Poll Rigging Will Happen In Bihar; BJP Hits Back With ‘Fake Narrative’ Jibe | India News
  • China To Give Pakistan Most Advanced J-35A Stealth Fighter With 400-KM PL-17 Missiles; How Will India Counter The Threat? | World News
  • Rekha starrer Umrao Jaan gets 4K re-release in cinemas from June 27: “None of us could have imagined the timelessness of the film” : Bollywood News
  • Thousands Gather Across Nation To Celebrate Eid al-Adha With Devotion & Unity | VIDEO | India News
  • India’s ‘Chenab Trap’ Chokes Pakistan’s Terror Route; Even China On Edge – Here’s How | World News

Category

  • Animals
  • Architecture
  • Automobiles
  • Business
  • Culture
  • Fitness
  • International
  • Lifestyle
  • Movies
  • National
  • Sports
  • Technology
  • Travel

Search

No Result
View All Result

Email

contact@awajludhianaki.org

  • About
  • Advertise
  • Careers

Copyright © 2019 Awaj Ludhiana Ki or it's affiliates | Website by Awaj Ludhiana Ki Team

No Result
View All Result
  • Home
  • Contact us
  • Animals
  • Architecture
  • Automobiles
  • Business
  • Culture
  • Fashion
  • Fitness
  • Food
  • International
  • Lifestyle
  • Movies
  • National
  • Sports
  • Technology
  • Travel
  • Punjab

Copyright © 2019 Awaj Ludhiana Ki or it's affiliates | Website by Awaj Ludhiana Ki Team

Login to your account below

Forgotten Password?

Fill the forms bellow to register

All fields are required. Log In

Retrieve your password

Please enter your username or email address to reset your password.

Log In