Warning: session_start(): open(/opt/alt/php72/var/lib/php/session/sess_e7e7c542637871448094be9929009ce1, O_RDWR) failed: Disk quota exceeded (122) in /home/shweuqjw/awajludhianaki.org/wp-content/plugins/jnews-social-login/class.jnews-social-login.php on line 83

Warning: session_start(): Failed to read session data: files (path: /opt/alt/php72/var/lib/php/session) in /home/shweuqjw/awajludhianaki.org/wp-content/plugins/jnews-social-login/class.jnews-social-login.php on line 83
New RFI issued for the long delayed FICV for the Indian Army - Awaj Ludhiana Ki
Friday, May 16, 2025
  • Home
  • National
  • International
  • Movies
  • Technology
  • Business
  • Fitness
  • Lifestyle
  • Punjab
  • Contact us
No Result
View All Result
No Result
View All Result
Home Business

New RFI issued for the long delayed FICV for the Indian Army

by author
June 24, 2021
in Business
0
New RFI issued for the long delayed FICV for the Indian Army
0
SHARES
94
VIEWS
Share on FacebookShare on Twitter


To be equipped with a 30mm main gun and anti-tank missiles besides other firepower and a capacity to carry three or more crew and soldiers.

For the third time the Indian Army has issued a fresh Request for Information (RFI) for Future Infantry Combat Vehicle (FICV). These vehicles are going to be the mainstay of the mechanized forces for a long time. The Indian Army is keen to get 1750 FICV, a project which is expected to cost around Rs 60,000 crore.

Related posts

EXCLUSIVE – Crypto giant Binance controlled ‘independent’ US affiliate’s bank accounts

EXCLUSIVE – Crypto giant Binance controlled ‘independent’ US affiliate’s bank accounts

June 5, 2023
Why investing just to save tax may be bad for you

Why investing just to save tax may be bad for you

June 5, 2023

According to the RFI that has been issued today, out of the total quantities, around 55 percent is going to be the Gun Version and balance would be Specialist Vehicles.

Within two years after the contract has been inked, the Indian vendors can collaborate with Foreign OEMS to deliver 75-100 vehicles per year. There will be a three stage induction model, as proposed by the Indian Army.

What is the Three Stage Induction Model proposed by the Army?

The Stage-I is for Limited Series Production (LSP). In this around 10 per cent of the total number of vehicles will be delivered over a period of two years. This means 75-100 per year.

The Stage-II is going to be Product Improvement. And around 40 per cent of the total number of vehicles are expected to be delivered spread over a period of six to seven years.

And in the final Stage-III, with technical upgrades and product improvement the balance number of vehicles will be delivered.

The response to the RFI issued today is expected in a couple of months’ time and once that comes then only the Ministry of Defence will grant Acceptance of Necessity, before the Request for Proposal is issued (RfP).

The Prolonged Saga of FICV

It all started in the late 2000s, when the Mechanised Infantry Directorate had initiated the formal process and the expected cost for replacing the old BMPs was around Rs 26,000 crore. And the plan was to have these vehicles by 2022.

The journey since then has been rough. In 2012, the proposal was withdrawn because the plan was to upgrade the existing vehicles.

And, in 2014, a new plan was rolled out by the government under which the Ordnance Factory Board and two private companies were to develop prototypes of the FICV.

In 2018 FICV project was shifted to Make II project to involve the private sector companies in this project under the Make in India initiative.

As reported by Financial Express Online, in 2019 Indian companies including the L&T, Mahindra and Mahindra, and others sent in their proposals to the Ministry of Defence (MoD).

Also Read: Why Indian Army’s $8 bn Future Infantry Combat Vehicle (FICV) project continues to be stuck in uncertainties

Even after putting it under the Make II, no decision could be taken and the file was sent back to the Indian Army Headquarters to understand from the end user how they wanted the project to move forward.

The decision to move it under Make II was taken in 2018, to help in expediting the process as well as promoting the Make in India initiative in the defence sector.

Why did this happen?

It happened due to the difference of opinion between the end user the Army and the MoD which wanted the Army to pay for the project. This led to putting the FICV on the back burner.

As reported earlier this project was initially approved under the Strategic Partnership (SP) model for the armoured vehicle segment. It was under the `Make’ category of DPP-2008, before it moved to the Make II of DPP-2016.

In 2018, the then defence secretary at the annual press conference confirmed that the FICV project has been shifted to the `Make II’ category. Responding to media queries, he had said that a shift to the `Make II’ has been made to fast track the project.“

Difference between Make & Make II

According to the DPP-2008, in Make II no funds are required from the ministry, whereas under Make category 90 per cent of the funds up to the prototype stage has to come from the ministry.

Indian Army actually needs a hi-tech complex FICV, which is expected to have a life span of more than three decades. These are needed to replace the current BMP-2 Russian origin infantry combat vehicles by 2025. However, the formal induction of these vehicles may not be before much later in this decade.

Which OEMS are interested in the project?

Original Equipment Manufacturers (OEM) like the US-based General Dynamic, Russian companies under the umbrella of Rosoboronexport, and German Rheinmetall, and South Korean Company have expressed their interest earlier.

Which are the Indian companies?

The Ordnance Factory Board (OFB), BEML, Mahindra Group, Ashok Leyland, Larsen and Toubro, Reliance, Bharat Forge and others.

What was required under the `Make’ category?

In 2016, under the `Make’ category, three development agencies (DAs) were planned which included two from the private sector and one from the Ordnance Factory Board (OFB). And the MoD was supposed to as per the procedure give a minimum Rs 500 crore each to the three DAs.

The Indian Army was asked by the MoD to seek a detailed project report (DPR) from all the contenders who had received the expression of interest (EoI) in 2016. By then the project which was already delayed by a decade got stuck further. The Integrated Project Management Team (IPMT)’ which was to seek reports from all the companies which had responded to the revised EoI took more than a year.

What is the Army looking for in the fresh round?

It should have the capability to carry loitering munitions, mini drones which can be used along the eastern, central and northern borders. To be equipped with a 30mm main gun and anti-tank missiles besides other firepower and a capacity to carry three or more crew and soldiers.

Get live Stock Prices from BSE, NSE, US Market and latest NAV, portfolio of Mutual Funds, Check out latest IPO News, Best Performing IPOs, calculate your tax by Income Tax Calculator, know market’s Top Gainers, Top Losers & Best Equity Funds. Like us on Facebook and follow us on Twitter.

Financial Express is now on Telegram. Click here to join our channel and stay updated with the latest Biz news and updates.





Source link

Previous Post

Firebolt raises $127M more for its new approach to cheaper and more efficient big data analytics – TechCrunch

Next Post

Committed to restoring statehood: PM Narendra Modi tells J&K leaders after all-party meet | India News

Related Posts

EXCLUSIVE – Crypto giant Binance controlled ‘independent’ US affiliate’s bank accounts
Business

EXCLUSIVE – Crypto giant Binance controlled ‘independent’ US affiliate’s bank accounts

June 5, 2023
Why investing just to save tax may be bad for you
Business

Why investing just to save tax may be bad for you

June 5, 2023
Share Market outlook today: Nifty, Bank Nifty may to gain on positive global cues; check support, resistance
Business

Share Market outlook today: Nifty, Bank Nifty may to gain on positive global cues; check support, resistance

June 5, 2023
Startup group of G20 calls for $1-trillion commitment
Business

Startup group of G20 calls for $1-trillion commitment

June 5, 2023
DHARAKSHA: Converting rice straw stubble to sustainable packaging material
Business

DHARAKSHA: Converting rice straw stubble to sustainable packaging material

June 4, 2023
Amrita Hospital, Kochi opens two new research centres; announces Rs 65 Crore for charitable care
Business

Amrita Hospital, Kochi opens two new research centres; announces Rs 65 Crore for charitable care

June 4, 2023
Next Post
Committed to restoring statehood: PM Narendra Modi tells J&K leaders after all-party meet | India News

Committed to restoring statehood: PM Narendra Modi tells J&K leaders after all-party meet | India News

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED NEWS

Taliban and resistance forces fight for Panjshir valley as wait for announcement of new govt continues | World News

Taliban and resistance forces fight for Panjshir valley as wait for announcement of new govt continues | World News

4 years ago
Homebrew backs Higo’s effort to become the “Venmo for B2B payments” in LatAm – TechCrunch

Homebrew backs Higo’s effort to become the “Venmo for B2B payments” in LatAm – TechCrunch

4 years ago
​​We will hunt you down and make you pay: President Joe Biden pledges to strike back after Kabul blasts | World News

​​We will hunt you down and make you pay: President Joe Biden pledges to strike back after Kabul blasts | World News

4 years ago
Coronavirus: Can a person get reinfected with Covid-19? ICMR scientists find these conclusions

Coronavirus: Can a person get reinfected with Covid-19? ICMR scientists find these conclusions

4 years ago

BROWSE BY CATEGORIES

  • Animals
  • Architecture
  • Automobiles
  • Business
  • Culture
  • Fitness
  • International
  • Lifestyle
  • Movies
  • National
  • Sports
  • Technology
  • Travel

BROWSE BY TOPICS

Architecture culture Fitness indian architecture indian culture indian culture and heritage indian news lifestyle national news Technology technology news Travel travelling

About Us

Awaj Ludhiana Ki

Address

2667/3, Kishore Nagar, Tajpur & Jail Road, Ludhiana – 141008

Recent News

  • Russia Expects To Pick Up Disrupted Peace Negotiation With Ukraine | World News
  • ‘It Was Very Important For Us To Rally Around Flag’: Shashi Tharoor Clarifies His Stance On Op Sindoor | India News
  • ‘Police Tried To Stop Me’: Rahul Terms Nitish Govt ‘Dhokebaaz Sarkaar’ During Bihar Visit | India News
  • Kriti Sanon stars in Pedigree’s wet food campaign for dogs : Bollywood News
  • India Questions Safety Of Pakistani Nukes As IAEA Rejects Radiation Leak Claims | India News

Category

  • Animals
  • Architecture
  • Automobiles
  • Business
  • Culture
  • Fitness
  • International
  • Lifestyle
  • Movies
  • National
  • Sports
  • Technology
  • Travel

Search

No Result
View All Result

Email

contact@awajludhianaki.org

  • About
  • Advertise
  • Careers

Copyright © 2019 Awaj Ludhiana Ki or it's affiliates | Website by Awaj Ludhiana Ki Team

No Result
View All Result
  • Home
  • Contact us
  • Animals
  • Architecture
  • Automobiles
  • Business
  • Culture
  • Fashion
  • Fitness
  • Food
  • International
  • Lifestyle
  • Movies
  • National
  • Sports
  • Technology
  • Travel
  • Punjab

Copyright © 2019 Awaj Ludhiana Ki or it's affiliates | Website by Awaj Ludhiana Ki Team

Login to your account below

Forgotten Password?

Fill the forms bellow to register

All fields are required. Log In

Retrieve your password

Please enter your username or email address to reset your password.

Log In